SeenewsSeenews
Search
Seenews
AlertsSeenewsSeenews
Searchclose
TOPICS
arrow
COUNTRIES
arrow
INDUSTRY
arrow
Economy
arrow
Browse Economy
Mix and match your focus countries with our advanced search
Investments
arrow
Browse Investments
Mix and match your focus countries with our advanced search
Deals
arrow
Browse Deals
Mix and match your focus countries with our advanced search
Tech
arrow
Browse Tech
Mix and match your focus countries with our advanced search
Green
arrow
Browse Green
Mix and match your focus countries with our advanced search
0/5
You have 5 free articles left this month
You have 0/5 free articles
Sign up to get 5 more free articles this month
SIGN UP
arrow
LOGIN
arrow

Terna launches Italy-Montenegro undersea power interconnection

Nov 15, 2019, 2:05:26 PMNews by : Radomir Ralev
share
November 15 (SeeNews) - Italian electricity transmission system operator Terna officially put into operation on Friday an undersea power cable linking Montenegro to Italy, it said.

Terna launches Italy-Montenegro undersea power interconnection
Source: Italian President's Office

The undersea cable represents the first "electrical bridge" between Europe and the Balkans, a crucial connection which will enable Italy to reinforce its role as European and Mediterranean electricity transmission hub, Terna said in a statement issued after the interconnection was inaugurated by Italian President Sergio Mattarella and his Montenegrin counterpart Milo Djukanovic at an official ceremony held simultaneously in Italy and Montenegro.

"Montenegro will have significant revenues based on the 20% stake of power transmission system operator Crnogorski Elektroprenosni Sistem (CGES) share in the total cable capacity. Through greater utilisation of the 400 kV network, we will reduce transmission losses and increase the level of technical resilience of the energy system. Ultimately, revenues from transit and leasing of transmission capacity will have the effect of reducing the costs of transmission system users," Djukanovic said in a video file posted on the website of Montenegrin public broadcaster RTCG.

The interconnection will allow a bi-directional exchange of electricity between the two countries of 600 MW of power initially, which will become 1,200 MW when a second cable is laid within the next few years, Terna said.

The 1.15 billion euro ($1.27 billion) project consists of an interconnection between Montenegro – Italy (underwater cable), the construction and enhancement of the internal 400 kV network in Montenegro, and the construction of 400 kV overhead lines between Montenegro, Serbia and Bosnia. The total length of the power line is 445 km and 423 km of it is laid on the seabed.

($ = 0.9065 euro)

Your complete guide to the emerging economies of Southeast Europe. From latest news to bespoke research – the big picture at the tip of your fingers.