The tie-up, comprising also IRD Engineering and Technital, will prepare the design and other project documents for the upgrade and construction of a second track and construction of new double-track line on sub-sections of railway line Hrvatski Leskovac–Karlovac, the notice in the Tenders Electronic Daily (TED) showed.
The advisory tender called by state-owned railway infrastructure operator HZ Infrastruktura drew a total of seven bids.
($=0.7548 euro)