March 11 (SeeNews) - Montenegrin state-owned power utility EPCG said it has cancelled a second tender for the supply and installation of two battery energy storage systems (BESS), each with a capacity of 100–130 kW for instantaneous power and 200–260 kWh for total energy storage.