PODGORICA (Montenegro), March 24 (SeeNews) – Montenegrin majority state-owned power grid operator Crnogorski Elektroprenosni Sistem (CGES) has called a tender for the third phase of the 400 kilovolt (kV) Lastva-Pljevlja power transmission project, the European Bank for Reconstruction and Development (EBRD) said on Monday.