SOFIA (Bulgaria), March 29 (SeeNews) - Bulgarian state-owned Electricity System Operator (ESO) said that it has opened a 83 million levs ($47.7 million/42.4 million euro) tender for construction of a 400 kV overhead transmission line between Varna and Burgas power substations, on the Black Sea coast.