April 19 (SeeNews) - Bulgarian thermal power plant (TPP) Maritsa Iztok 2 said it has signed a 3.2 million levs ($2.0 million/1.6 million euro) deal for the repair and maintenance of the flue gas desulphurization system of its units 1 to 4 with local rubber products maker ZKI Volta.