April 16 (SeeNews) - Romanian railway operator CFR said it has started repair works on a railway bridge crossing the Olt river with an estimated budget of 1.73 million lei ($370,735/347,830 euro), aiming to increase train speed between the stations of Draganesti Olt and Farcasele.