TIRANA (Albania), December 15 (SeeNews) – German engineering consultancy Fichtner has won a 1.97 million euro ($2.5 million) tender for the preparation of a prefeasibility study, a feasibility study, and tender design for providing safe flood management of the hydropower plants of the Drin river cascade in Albania, the World Bank said.