SARAJEVO (Bosnia and Herzegovina), December 21 (SeeNews) – Bosnian power utility Elektroprivreda BiH [SAJ:JPESR] has launched a tender for preparatory works ahead of the construction of a 450 MW unit at the existing Tuzla thermal power plant (TPP).