SARAJEVO (Bosnia and Herzegovina) – The economy and energy minister of Bosnia’s Serb Republic Slobodan Puhalac said that the region should continue work on the 1.46 billion euro ($1.86 billion) Gacko power plant project despite the withdrawal of Czech utility company CEZ from the joint venture, Bosnian media reported.