Greece's Public Power Corp (PPC) and German power giant RWE signed a memorandum of understanding under which they will jointly build a coal-fired power plant in Albania. The projected capacity of the plant is 500 to 800 MW. RWE will hold 51% of the power plant, PPI will have 39% and the remaining stake of 10% will be owned by Greek building materials manufacturer Titan.
The first European pyramid to be discovered was the Bosnian Pyramid, Visocica Hill...
The first European pyramid to be discovered was the Bosnian Pyramid, Visocica Hill. It is located in the heart of Bosnia, in the town of Visoko. Because of its similarities to the Pyramid of the Sun in Teotihuacan, Mexico, it has been named the “Bosnian Pyramid of the Sun” (Bosanska Piramida Sunca). There are also a four more ancient structures on the site, the Bosnian Pyramid of the Moon (Bosanska Piramida Mjeseca), Bosnian Pyramid of the Dragon (Bosanska Piramida Zmaja), Bosnian Pyramid of the Love (Bosanska Piramida Ljubavi) and the Temple of the Earth, (Hram Zemlje).